• About
  • |
  • Contact
  •   Español
Bienvenido a LT Argentina
  Español
Busbar machine sold worldwide CNC Copper Busbar Bending Punching Cutting Machine Manufacturer
Whatsapp / Tel: +8613853146766

Three detection methods of nailing to avoid wires in the wall

time: 2025-02-28 admin: Sincerity

In home decoration, the accident rate of electric shock and tripping caused by accidental injury of wires by nailing is as high as 37%. Based on electrical standards and practical experience, this paper explains in detail three professional methods for accurately detecting wires in walls to help you construct safely.


Method 1: hydropower drawing positioning method (accuracy 95%)

The hydropower construction drawing provided by the decoration company is the core basis:


Measurement and positioning: mark the horizontal/vertical extension area on the wall according to the pipeline position marked on the drawing with a tape measure.

Safety scope: Take the socket as the center, and avoid the "high-risk area" of 15cm from top to bottom, left and right.

Remedy for missing drawings: If the drawings are lost, you can contact the original decoration company for electronic filing.


Method 2: Instrument detection method (accuracy 80%-99%)

2.1 Professional wall detector

Working principle: detecting metal pipelines by electromagnetic waves.

Key points of operation: move along the wall at a uniform speed, and stop immediately in case of alarm sound (detection depth reaches 8cm).

2.2 non-contact measuring pen

Economic scheme: Suitable for thin wall inspection.

Operation skill: drill a 3mm shallow hole at the pre-nail position, and insert an electric pen to test whether it is charged.


Method 3: Empirical judgment method (accuracy 70%)

When tools are lacking, risks can be avoided according to the wiring rules:

Avoid "cross area": 30cm above and 30cm below all socket switches, and extend horizontally.

Listen to the sound and identify the position: tap the wall with a metal tool, and the hollow sound area may be wired.

Observation of cracks: 10cm along the longitudinal cracks on the wall surface (mostly at the slots of buried pipes) are prohibited from nailing.

Gold standard of safe construction

Power-off operation: power off the corresponding circuit before construction.

Layered drilling: drill a 2cm shallow hole for detection, and then go deep after confirming that there are no wires.

Emergency treatment: If plastic chips (pipes) are drilled, stop drilling immediately, and then operate when the deviation is ≥5cm.

Tool selection guide

Tool Type Applicable to Scene Accuracy Cost

Water and electricity drawings New house/with archive decoration

Wall detector old house/complex line

Simple suspension operation of contactless electric pen

Keep in mind that the three steps of "inspection, measurement and inspection" can reduce the risk of electric shock by 90%! It is recommended to collect this article and forward it to friends who are decorating.

LT Argentina pertenece a la casa matriz LT. Fabricamos máquinas CNC de punzonado, corte y plegado de barras de cobre y aluminio para tableros y distribución en Argentina y el Mercosur.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 No.9566 Jingshi Rd.Jinan City,Shandong,China
  [email protected]
 +8613853146766
WhatsApp

WhatsApp

WeChat

WeChat

Copryright  2025 LT Argentina Todos los derechos reservados.